Business Floors Across the Twin Cities

Proven Commercial Concrete Coatings in Delano, MN

Every hour a business floor sits closed costs money, and every slip or stain costs more. Drews Industries plans each coating project around your schedule. Then we build the system for the traffic and spills your space sees.

Sealed Business Floors That Keep Up With the Work

Commercial concrete coatings turn a dusty, stained business slab into a sealed floor. It resists spills, sheds less dust, and gives staff better footing. The right system depends on your traffic, your chemicals, and how your staff cleans the floor each night. No single coating fits every building.

A business owner once told us the floor is the only thing every employee, customer, and delivery driver touches. When it cracks, dusts, or turns slick, everyone in the building notices before lunch. A coated floor fixes those problems at the surface and keeps fixing them every shift.

Our Delano shop sends concrete crews across Wright County and the whole Twin Cities metro. That runs from Plymouth and Maple Grove to Shakopee and Eagan.

  • High-strength epoxy and polyaspartic systems
  • Slip resistance, safety striping, color zones, and logos
  • FDA-approved coating options for food service and plants
  • Phased floor schedules that keep your doors open
Get a Free Estimate 

Share your building type and square footage. We will plan a site walk around your business hours.

This field is for validation purposes and should be left unchanged.
Address(Required)
Industrial floor grinding machine used for surface preparation at Drews Industries.

Each Industry Brings Its Own Floor Problems

A warehouse floor fails from forklift traffic. A restaurant floor fails from grease and water, and a fire station floor fails from heavy trucks and constant washing. The coating has to match the threat, so we never sell one product for every space.

Need a coating for a plant floor? Our industrial floor coatings page covers heavier process floors.

What Changes Once the Business Slab Is Sealed

Bare concrete is porous and soft at the surface. Every forklift turn, dropped pallet, and winter boot grinds a little more dust loose, and that dust settles on shelves, stock, and equipment. Spills soak in. Those stains never mop out.

After we coat the floor, dust stops rising. Spills stay put. Staff can wipe them up in seconds. The room looks brighter too, because a coated floor bounces more light back up and helps workers spot cords, edges, and debris sooner.

Cleaning crews notice it first. A sealed floor sweeps faster and scrubs cleaner, so nightly upkeep takes less time all year.

Minnesota Winters

Coated Entries Stand Up to Salt and Slush

From November through April, every door in your building lets in slush, sand, and road salt. A bare slab drinks that brine, and each freeze cracks loose a bit more of the top layer. Entryways and loading areas show the damage first.

Our concrete coatings seal those high-risk zones. Brine then sits on top until a squeegee or auto scrubber clears it away before it can do any harm to the slab. Added grit keeps footing steady on wet mornings when snowmelt spreads across the entrance.

Drews Industries shop entrance in Delano MN after a snowfall
ACI-Certified Foremen
Paperwork and Planning

What Facility Managers Get Before Work Starts

Commercial jobs live or die on planning. Before a single grinder arrives, your team has a written scope that answers the questions owners, tenants, and staff will ask.

1. A Zone Map With Return Dates

Every room or bay on the job gets a name, a square footage, and a date it returns to service. Managers can share that map with staff and tenants weeks ahead.

2. A Phasing Plan for Open Hours

Nights, weekends, or one wing at a time are all options. We pick the phasing that keeps customers and staff moving while each closed zone gets its coating.

3. Site Rules for Our Crew

Our crews follow your sign-in, parking, and safety rules on site. Containment, dust control, and fume plans are written into the scope so nothing surprises your neighbors or tenants.

4. A Care Plan for the Cleaning Team

Your janitorial staff gets plain care steps for the new floor. That covers which cleaners to use, which to avoid, and how frequently to scrub the high traffic lanes.

Systems Behind Our Commercial Epoxy Flooring

High-strength epoxy forms the core of most commercial epoxy flooring we install. It builds a dense layer that shrugs off impact and chemicals. Where sunlight reaches the floor, we finish with a UV-stable polyaspartic topcoat so the color stays true. Quartz adds strength and grip where the work is roughest.

Why Drews Industries

Why Businesses Trust Drews With Their Floors

A business floor has to survive traffic, spills, and tight schedules. Owners call us because we handle the concrete and the coating under one contract, which removes a whole layer of finger pointing.

One Contract for Concrete and Coating

Cracked joints, broken sections, and failed patches are part of our daily concrete work. We repair or replace them ourselves, so the coating crew never inherits a slab another contractor left half done.

Foremen With Concrete Credentials

Our foremen hold American Concrete Institute certification. That background matters on commercial slabs, where old sealers, curing compounds, and hidden moisture cause most coating failures.

Schedules That Respect Your Revenue

A closed business loses money every hour. Phased zones, after hours shifts, and weekend starts are standard tools for us, and each one is set before you sign anything.

Questions Business Owners Ask Before Coating

Do you coat large commercial and municipal floors?

Yes. We coat warehouses, production floors, fire stations, and other city buildings. Smaller shops and restaurants are on our list too. Large floors run in phases, so part of the building stays open while another zone cures. Our estimator maps each zone, the order of work, and the return-to-service dates before your project starts.

Can our logo and safety lines go into the floor coating?

Yes. Logos, safety striping, and color zones become part of the coating system instead of paint on top. We place them before the final topcoat, so the clear layer protects them from tires and boots. That is why built-in lines stay sharp far longer than striping paint rolled onto bare concrete.

Which coating works best on a busy commercial floor?

High-strength epoxy suits most heavy indoor floors, while a polyaspartic topcoat handles areas that get sunlight. Quartz broadcasts add grip and strength in wet or rough zones. We pick the final system after we stand on your floor and check the slab. We also ask which chemicals, vehicles, and cleaners it faces each day.

How long will our space be closed during the coating work?

Closure time depends on the size of the floor and the products we use. Many businesses stay open by coating one zone at a time or working over a weekend. We confirm cure times during planning, so you know the exact days each area will be out of service before you agree to anything.

Do you serve businesses outside Delano?

Yes. Our commercial coating crews travel from the Delano shop to job sites across the Twin Cities metro. Minneapolis, Bloomington, Plymouth, Eagan, and Brooklyn Park are all on our route. Distance does not change our prep standards, and every project still gets an ACI-certified foreman on site.

Get a Free Estimate

This field is for validation purposes and should be left unchanged.
Address(Required)
Free Estimates

Give Your Team a Floor That Works With Them

Your staff should not fight the floor to get through a shift. We will walk the building and check the concrete. Then we match commercial concrete coatings to your industry and your calendar. Call (763) 972-4010 to get on our walkthrough schedule, or visit the Drews Industries home page to see more of our work.